Cleantech 30mm 1100W Electric Rotary Hammer

Model NO.: CT-ARH-003
Impact Energy: 6.0j
Power Supply Type: AC Power
Diameter of Bore: 30mm
Unloaded Speed: 780r/Min
Trademark: OEM
Transport Package: Carton
Specification: 46X27X34CM
Origin: China
HS Code: 8467299000
CLEANTECH 30mm 1100W Electric Rotary Hammer 
Cleantech 30mm 1100W Electric Rotary Hammer

I, Product Features:
1, Unique rotation system, lock the flat chisel in 12 position;
2, Anti-vibration system;
3, Ergonomic handle with soft grip;
4, Safety clutch;
5, High torque motor with dustproof desgin;
6, Variable speed swtich available;
7, Perfect combination of hammer & breaker;
8, Suitable for large drill bits, deep holes or damage operations.



II, Product Spefications: 
Item Specifications
Model No. CT-ARH-003
Related Voltage: 110V - 240V
Frequency: 50 / 60Hz
Related Power: 850/1100W
Max. impact rates: 3000 bpm
Impact Joules 6.0J
Weight 6.5KGS

III, Product Applications:
Cleantech 30mm 1100W Electric Rotary Hammer

IV, Products Quality Control:
4-1, Advanced Assembly Workshop - Over 20 Assembly Lines
Cleantech 30mm 1100W Electric Rotary Hammer
4-2, Big Area Warehouses - Good Protection
Cleantech 30mm 1100W Electric Rotary Hammer
4-3, Quality Assurance 
4-3-1, New Project Development Process
During new project qualification status: we do a lot of test to qualify the machine, such as Motor endurance test, Vacuum Test, Temperature rise test, Hose pull test, Leak test and Drop Test, etc..
4-3-2, Production Goods Quality Control Process
Cleantech 30mm 1100W Electric Rotary Hammer


We have more than 25 quality engineers to monitor and track quality status during incoming goods, in-process and finish goods. Make sure all goods are meet customer's requirement before ship the goods.
4-3-3, Related Quality Process
Cleantech 30mm 1100W Electric Rotary Hammer
4-3-4, Related Product Certificates
All products had been certificated with CE/GS/EMC/LVD/CETL/ROHA/PAHS

Production and Samples Lead-time:
Samples Lead-time:
3-7 working days - It will be confirmed base on product requirement;
Mass Order Lead-time :
20 - 50 days - It will be determined base on actual order quantity and product requirement. It will speed a little more time for the 1st order as need to confirm all design of packing designs such as label, color box, manual, etc.


 

HDF Wooden Door

Shengyi Door Co., Ltd. , http://www.china-security-door.com