The smart parking project will involve a problem of construction and installation. Although the parking barrier looks simple, but the installation still needs some details to pay attention to, these details can make the life of the barrier longer, the staff to operate more For convenience. So what aspects do we need to pay attention to in respect of barrier installation?
1. Horizontal barriers should be installed on the horizontal surface. If the road surface is uneven, a water platform should be set up. The wiring installation can be carried out according to the drawings. Generally, there will be no problem.
2. Testing of the ground coil When the smart parking system is connected to the line, the ground coil can be tested. Do not wait until the line is buried well before testing. The test method is: When the red light of the ground is flickering, put the iron plate on the coil. When the red light is on, remove the iron plate. The automatic drop of the brake lever is normal.
3. The sense coil installed on the ground coil is generally installed in two lanes, one each before and after. The installation method is to cut a 10cm deep, 2X0.8M square nest on the road, cut the four corners to 45 degrees, place 5 to 6 coils, press it tightly, no joints inside the coil, damage, installation After sealing with dry cement.
4. Problems with the length of the gate If the gate is trimmed, it is necessary to re-adjust the moment balance according to the length of the rod, which can avoid overheating of the motor and wear of the gearbox.
1. Horizontal barriers should be installed on the horizontal surface. If the road surface is uneven, a water platform should be set up. The wiring installation can be carried out according to the drawings. Generally, there will be no problem.
2. Testing of the ground coil When the smart parking system is connected to the line, the ground coil can be tested. Do not wait until the line is buried well before testing. The test method is: When the red light of the ground is flickering, put the iron plate on the coil. When the red light is on, remove the iron plate. The automatic drop of the brake lever is normal.
3. The sense coil installed on the ground coil is generally installed in two lanes, one each before and after. The installation method is to cut a 10cm deep, 2X0.8M square nest on the road, cut the four corners to 45 degrees, place 5 to 6 coils, press it tightly, no joints inside the coil, damage, installation After sealing with dry cement.
4. Problems with the length of the gate If the gate is trimmed, it is necessary to re-adjust the moment balance according to the length of the rod, which can avoid overheating of the motor and wear of the gearbox.
SUCP204 205 206 207 208 209 210 211 212
2 Pillow Block Bearing Sp209,Pillow Block Bearing Housing Sp209,Pillow Block Bearing Sp209 Sizes
Jiangsu Dingtian Stainless Steel Products Co., Ltd. , https://www.dingtiancasting.com