Remedial measures should be taken for the occurrence of fat damage, the soil in the fertilization site should be excavated, the soil in the hole should be poured with clean water, the concentration of soil fertilizer solution should be diluted, and the coarse roots that have been rotted should be cut off, and the new soil will be covered. The branches are trimmed.
To prevent the occurrence of fertilizer damage, it is necessary to achieve reasonable fertilization:
1. Reasonable selection of fertilizer varieties. Perennial economic crops should be mainly composed of soil and organic fertilizers. Fertilizers and organic fertilizers should be mixed and applied. Soil and fertilizers and organic fertilizers can provide various nutrients, improve soil and improve soil. Buffering capacity to reduce the occurrence of fat damage. The same is chemical fertilizer, containing chlorinated fertilizer is the most prone to fat damage, there are many varieties of fertilizer on the market, the quality is not abandon, the majority of farmers should pay special attention when choosing.
2, improve the fertilization method, winter and spring base fertilizer should be applied in the outer ring of the canopy, the depth and width of the ditch are 20-30 cm, after the application of soil, when the fertilizer is applied as a top dressing, it should be poured with water, or when the soil is wet after rain. Apply.
3. Control the amount of fertilizer, especially nitrogen fertilizer. For the average plant producing 50 kilograms of orange and pear trees, the urea should not exceed 100 grams per plant, and the other nitrogen fertilizers should not exceed 250-300 grams. More than 25 kg, a small number of multiple applications should be promoted for young and sick fruit trees.
Sealand is a trustworthy manufacturer of Gas Mass Flow Meter, Gas Mass Flowmeter, Gas Flow Meter, Gas Flowmeter, Gas Meter, ATEX, IECEx & CE approved.
The installation is as follows.
1. Installation Steps
a) Choose correct installation site, taking installation area, pipeline, transmitter location &
valve location into consideration;
b) Install the meter according to direction mark on sensor;
c) Install the sensor & transmitter on pipeline;
d) Connect transmitter & sensor with 9-pin cable;
e) Start.
a) Sensor stays away from mechanical vibration source, for example, pump. Use flexible pipe to connect meter with pipeline if inevitable. The housing of meter must be standalone, out of touch with any other device. There must be 3 times the size of sensor between 2 sensors if there are many flow meters on the same pipeline, to avoid resonance.
b) Do not install sensor on pipeline that easily expands with hot and contracts with cold, especially near expansion joint, which leads to a worse stability.
c) Sensor stays away from industrial electromagnetic field, such as large generator and transformer, better 5m at least. Such device influences the performance of drive coil and pickoffs. Make sure magnetic field intensity less than 400A/m.
d) Sensor shall be installed on lower pipeline, to be easily full of fluid.
e) Make sure Ex-mark meet application requirements if in hazardous area.
f) Build a sunshade if the meter is under direct solar radiation. g) Keep the meter from corrosive liquid.
Gas Mass Flow Meter, Gas Mass Flowmeter, Gas Flow Meter, Gas Flowmeter, Gas Meter
Zhejiang Sealand Technology Co., Ltd. , https://www.sealandflowmeter.com