What are the order of interior decoration? Interior decoration precautions

The living standards have been continuously improved. Many families have already purchased buildings. We all know that after the purchase of the building, it is necessary to decorate. However, during the renovation, I found that the order of the interior decoration and the interior decoration skills are completely incomprehensible. Although it is not our own decoration, it is necessary to understand the order and precautions of the interior decoration before the decoration . Let's take a look at it today!


室内装修的顺序


The order of interior decoration:


Pre-design

One of the things we have to do in the early design is to make a detailed measurement of your room, which is more accurate than the purchase of building materials, and it is more immune to hacking at the time of settlement.


The main contents of the measurement include:


1. Identify the area involved in the renovation process. Especially the tile area, wall paint area, wallpaper area, floor area.


2. Identify the main wall dimensions. Especially in the future, it is necessary to design the wall size of the furniture.


Main body modification

Entering the construction stage, the main body demolition is the first project, including the demolition of the wall, the shovel wall, the disassembly of the heating, the replacement of the steel window and so on. To put it bluntly, it is to put the frame of the construction site first.


Hydropower transformation

Between the two aspects of hydropower transformation and main body demolition, some rookies may know that the first measurement of the cabinet should also be carried out. In fact, the so-called cabinet measurement did not have any actual content. Because the wall and the ground were not treated, the cabinet designer could not give the specific design size, but only the water outlet and the hood socket reserved by the developer. Location, make some relevant suggestions. mainly include:


1. Look at the location of the hood socket to affect the installation of the hood later.


2. Look at the location of the water meter.


3. Check if the position of the water outlet is convenient for installing the sink later.


For the first measurement of the cabinet, a slightly experienced rookie can do it himself. After the completion of the waterway renovation, it is best to do the waterproofing of the bathroom. The kitchen generally does not need to be waterproof.


Some rookies have always thought that some ingredients should be in advance before the renovation begins. I would say that the master, unless it is subject to change demolition Ingredients needed, otherwise, the approach time such as ceramic tile, etc. Ingredients should Daixinban after the transformation of water and electricity. Because the circuit transformation involves the ground slotting, if the position of the tiles and the large core board are not properly placed, it is very troublesome for the workers to move in and out.


Woodworking

Woodworkers, masons, and painters are the "three brothers" in the construction process. The basic order of appearance is: woodwork, mason (waler), painter. The basic appearance principle is who is dirty and who is first


Tile

If the workers are too busy, the foreman will usually let the "Mason" go to the bricks when the "woodworking boss" is not over yet. This is normal because there is no conflict between the two.


The process of “Mason BB” operation also involves the installation of the following three links:


1. Installation of door stone and marble window sill. The installation of the stone can be done with the paving slabs. After the paving slabs, the installation of the marble sills is usually done after the window sills are completed. The marble workers will prepare the glass glue and seal the marble and window coverings with glass glue. It is.


2. Installation of floor drains. The floor drain was the first to appear in the home improvement hardware because he had to work with the floor tiles. Therefore, when rookies start to visit the building materials market, they should buy floor drains early.


3. Installation of the hood. The range hood is the first to appear in the home appliance. After the kitchen wall and floor tiles are laid, you can consider installing the range hood.


"Mason second child" left the scene, this time can be measured about the second time of the cabinet. Accurately, after the kitchen wall tiles are installed and the hood is installed, the cabinet can be measured for the second time.


室内装修的顺序


Brush wall finish

Oiler's third child came into the field, mainly finishing the wall surface treatment, brushing the topcoat, painting the furniture for the "carpentry boss", etc. The rookie who prepared to paste the wallpaper only needs to let the "oiler's third child" plan in the post. The wall of the wallpaper can be processed at the base level.


At this time, when the "Boss", "Lady" and "Lao" have left the scene one after another, many rookies will think that their decoration is over. In fact, one third of them are not enough according to the number of links. The reason why everyone feels this is because the decoration that people generally understand is only the “construction link” of the decoration. In fact, the “installation link” of the decoration is also the main focus of the decoration.


Precautions for interior decoration order?


1. The first step is to apply for admission. Generally speaking, the formalities and copying of the ID card of the person in charge of the renovation team, the original and photocopy of the ID card of the owner, the copy of the business license of the decoration company, and the construction of the decoration company are required.

A copy of the certificate, as well as a decoration deposit, of course, you need to specifically ask the owner's housing management office before handling.


2. Decorations are not free to pierce holes in load-bearing walls, remove walls that connect balconies and doors and windows, and extend the size of existing doors and windows, perhaps to build separate doors and windows. This practice will form part of the high-rise cracks and seriously affect the seismic capacity, and then shorten the high-rise

Use life. The decoration of the balcony should be as small as possible, because the balcony will be overturned and overturned.


What are the interior decoration techniques?


1. Install a long mirror at the entrance of the gate to be practical and convenient. Go out to finish the dress. In addition, you can also consider installing a low stool, sitting and changing shoes, saving time. Consider the length of the shoe, the width of the shoe and the height of the shoe (long boots)

Consider the utilization of the width of the shoe when many pairs of shoes are placed at the same time.


2. When washing vegetables in the winter and washing the pot, using hot water can make the hands not frozen and the pots and pans are easy to remove oil. However, most people's homes, kitchen faucets are connected to the water heater in the bathroom, or the solar water heater on the roof, which will cause water wastage, and still need to wait and spend more time.


Before the decoration, I learned about the order of the interior decoration and its precautions. It will be a lot easier to find someone to decorate. The above is the sequence of interior decoration and the decoration notices introduced by Xiaobian today. It is over here. For more information, please continue to pay attention to the decoration home network.



More related wonderful reading:

Cleaning method after interior decoration, cleaning precautions after interior decoration

American interior decoration design introduces American interior decoration precautions

How to carry out interior decoration? Precautions for interior decoration

What are the types of interior decoration lights? Interior decoration lamp installation skills

What should I pay attention to in simple interior decoration? Simple interior decoration quotation form

Kitchenware

Wire Stainless Steel Product.

China Kitchen Rack,Sink Grid,Stainless Mesh Storage Baskets,Kitchen Wire Storage, we offered that you can trust. Welcome to do business with us.

Kitchen Rack is made of high quality 304 stainless steel, This kind of material steel luxury, never rust, resist corruption, easily clean, safe, healthy and durable. Prevent rust or chemicals from contaminating food and damaging health

Kitchenware,Bread basket,dish rack,cutting board rack,Sink Grid,dish drying rack

Shenzhen Lanejoy Technology Co.,LTD , https://www.bbq-grillgrate.com