Paint coating acceptance work: a knock on it

With the continuous improvement of people’s living standards, the selection of wall tiles and paints in residential decoration has become more frequent and more advanced. Right now, whether it is the price of tiles and floor tiles or paints and labor costs are rising rapidly, it has also become the bulk of spending on residential renovations. In order to avoid cost problems in the above-mentioned renovations, many of my friends would like to know how to carry out the inspection and acceptance work for wall tile inlays and paints.

Tiles, tiles, and paints are commonly referred to as “face” projects and may be checked by visual inspection and feel after renovation. Wall tile mosaic acceptance mainly remember 8 words: a knock, a look, a touch, a splash, the following one by one:

A knock - gently tap the wall and the ground in order to prevent the occurrence of "empty drums" on the wall and the ground. This is a taboo for the quality of the wall and the floor. If the sound of the tap is dull, it means that the inlay is more solid. On the contrary, if a “squeak” sound is issued, it indicates that the tiles are not firmly attached. This is not only a matter of construction quality, but it even affects the safety of human life. It must be knocked off and revisited immediately.

A look - directly observe the color of the wall tiles and paint paint, to see if the color is soft, especially if there is no color. Here are a few tips for the audience. When the tile is shipped, check the color number on the product packaging label. Please note that the color number on the mark must be the same, otherwise it may be chromatic aberration.

Touch - touch on the wall and floor that has been plastered, and feel if the tiles are uneven. Special attention should be paid to whether the caulking between the tiles is smooth and compact, otherwise the tiles will not be firm and even leaking.

One splash - splashing water on the floor and walls that have been laid, mainly checking two things. One is to see whether the surface water flows quickly, and the other is to see if the floor surface is leaking. If there is still water on the ground after splashing water, it means that the ground does not have an inclined slope, which is obviously a construction quality problem. When checking the ground for leakage, it is advisable to splash water several times and watch for some time after splashing water.

Construction acceptance floor paint paint paint residential door price

Elevator Traction System

The function of the elevator traction system is to output and transmit power to drive the elevator. It is mainly composed of traction machine, traction wire rope, guide pulley and reverse sheave. The towing machine provides power for the operation of the elevator, which is composed of motor, towing wheel, coupling, reducer and electromagnetic brake. Both ends of the pulling wire are connected to the lift car and counterweight respectively, and the lift car is driven up and down by the friction between the wire rope and the pulling wheel. The guide wheel is used to separate the space between the lift car and the counterweight. The use of compound winding type can also increase the drag force. Professional Elevator Traction System manufacturer is located in China, including Traction Elevator System,Traction Lift System,Traction Elevator, etc.

Elevator Traction System,Traction Elevator System,Traction Lift System,Traction Elevator

Suzhou Stable Trade Co., Ltd , https://www.stable-elevator.com